Heights on Austin
Bulk excavation and shoring works in the heart of Coquitlam.
Burquitlam Park
Excavation and shoring scope for two buildings in Burquitlam Park along with site clearing, decommissioning, and demolition works.
Fraser Gate IP Line Replacement
300 meters of 762mm (NPS 30”) Intermediate Pressure Pipeline installation.
60th Avenue Watermain and Roadworks Improvements
Road and watermain improvements along 60 Avenue from 124 Street to 126 Street and from 144 Street to 148 Street. Work included excavation and disposal of materials offsite, clearing and grubbing, importing and placing of granular fills, asphalt paving, curbs, sidewalks, Multi Use Pathways, driveways, drainage and utilities, Allan block retaining wall, bus pad, pavement markings, watermain installation, street signs and street lighting.
Yorkson Creek Culvert (84 Ave)
27.5m precast culvert & two 3000 SF lock-block retaining walls in fish-bearing creek.
Kinder Morgan Tank Farm
Stabilization of slopes surrounding large storage tanks with shotcrete and anchors.
University District
Bulk/detail excavation and shotcrete shoring.
The Creek
Bulk/detail excavation, removal of contaminated soils, shotcrete shoring & anchors, and micro piles.
South Fraser Perimeter Road
Installation of 1.2 million tonnes of pre-load material for the proposed highway.
Nicomekl Dyke
Dyke widening and raising, including property restoration and hydro-seeding.
Lakewood Park
Off-site servicing, on-site servicing, and roadworks for a 120-unit site.
Hyland Creek
Design and construction of a value-engineered bridge
City Centre Drainage
Installation of 900m of storm pipe along 104th Ave, with paved road construction.
Cardero
Bulk/detail excavation, soil remediation, shotcrete shoring, & micro piles.
Bose Farm
Servicing and roadworks for a 100-unit site, coordinating with BC Hydro, Telus, & Shaw.
Yorkson Creek Culvert (86 Ave)
45m precast box culvert, 2000SF and 2700SF Sierra Slope retaining walls in a fish-bearing creek.