Project Description
Owner:
BC Ministry of Transportation
Design Engineer / Consultant:
CH2M Hill Consultants
Delcan Consultants
Contract Value:
$21.7 M
Scheduled Duration:
Mar 2009 – Sep 2010
Project Description:
Installation of 1.2 million metric tons of pre-load material to assist in the construction of the proposed highway.
It also includes cleaning and demolition of existing structures, and 180m of culvert installation