Project Description
Owner:
Anthem Properties Group
Contract Value:
$17M
Scheduled Duration:
2019 – 2021
Project Description:
The project was a mixed-use development with a 330-unit townhome development. Mainland was responsible for civil scope of works, both on and off-site, including excavation, roadworks, curb and gutter sidewalk construction, waterworks, storm and sanitary, streetlights, bus pads and driveways. A new 1200mm diameter fish culvert was installed to allow for safe passage of fish up Bear Creek.